THE MEDIA VOICE OF THE GLOBAL MARINA INDUSTRY

Resilient marina renovations lead to coral relocation

by Marie Guyer and Anne Shoffner
Fisher Island, a private barrier island community south of Miami Beach, Florida, is renovating its 1980s resident marina with sea level rise resilience and the modern boater in mind. Remarkably, the artificial and highly active marina basin supported a thriving stony coral community, creating an environmental obstacle when upgrading from a fixed to floating dock system.

Fisher Island Club’s fixed slip marina system has now been reconfigured and replaced with Bellingham Marine floating docks to help mitigate problems with projected sea level rise.

Fisher Island Club’s fixed slip marina system has now been reconfigured and replaced with Bellingham Marine floating docks to help mitigate problems with projected sea level rise.

Outgrowing the existing 86-slip marina and approaching the end of the useful life of the timber fixed docks, an overhaul was due at Fisher Island Club’s resident marina. With this renovation, Fisher Island Club seized the opportunity to safeguard its marina investment by incorporating resilient docking features.
In South Florida, the estimated service life for a marina is 30 to 40 years, during which time water levels are projected to change significantly due to sea level rise. For fixed dock configurations, water level increases trigger premature replacement or repairs, creating an additional expense and an unwelcome interruption in marina operations. To circumvent these future water level challenges, Fisher Island Club chose a floating dock system. Floating docks inherently adapt to changes in water levels, as well as storm surge, offering a level of resilience to the projected sea level rise. Bellingham Marine was selected as the general contractor and floating dock manufacturer for the project.
Optimising berth configuration
The original marina satisfied the market when built in the 1980s, with most slips under 60ft (18m) in length, but the new configuration has been designed for the modern boater, with 80% of slips in the 60 to 70ft (18 to 21m) range and 20% in the 90 to 120ft (27 to 37m) range. Efficient use of the existing basin also allowed for 13 new slips, for a total of 99-slips.
Basin modifications
The change from fixed docks to floating docks, the increase in vessel draft, and the creation of new slips necessitated dredging and removal of previously placed rock riprap. The existing rock riprap, approximately 1 cubic yard per linear foot of seawall, was directly in the proposed footprint of the 8ft (2.4m) wide marginal floating dock and lined the 2,200ft (671m) perimeter of the basin seawall. The riprap consisted of rock boulders approximately 2 to 6ft (0.6 to 1.8m) in diameter and was installed with the original marina.
Through discussions with environmental agencies and review of historical information, it was determined the rock riprap was originally required by the County as a means of creating nearshore habitat as well as providing toe scour protection for the seawall. Fortunately, the State and Federal government allowed for its replacement under a permit exemption without mitigation requirements. The replacement toe scour protection measures have a lower profile to accommodate the rise and fall of the floating docks with the tide. The engineering design and permitting for the marina basin renovations was provided by Cummins Cederberg.
Thriving coral colonies
As part of applying for environmental permits for marina construction in Florida, in-water surveys were performed by the Cummins Cederberg marine science team to document any protected marine organisms, such as stony coral colonies or seagrass in the construction area. Within the Fisher Island Club marina, marine scientists identified several hundred healthy ‘urban’ stony coral colonies, ranging from 6in to 3ft (15cm to 1m), growing on the rock riprap below the fixed docks.
These ‘urban’ corals are the focus of many researchers, who are trying to determine how and why the corals, growing in marina basins, large ports and industrial areas, are doing so well. The stony corals found in the resident marina were particularly hardy and well-adapted to their environment, which was remarkable considering the existing fixed docks decrease light penetration and the vessel activity increases water turbidity, both of which can be harmful to coral colonies.
Coral relocation
To allow for rock riprap removal, the local permits required all stony corals greater than 6in (15cm) be detached from the rock riprap and transplanted to a suitable off-site location. To relocate the corals, it was first necessary to find a nearby recipient site with appropriate water depth, clarity and substrate with enough available open space to reattach the stony corals from the marina basin. A site with relatively shallow water, located east of the island and immediately south of the entrance to Port of Miami, was selected as the most suitable location to transplant the colonies.
Divers investigated the health of the coral colonies and how best to  transplant them.

Divers investigated the health of the coral colonies and how best to transplant them.

Following acquisition of the appropriate authorisations and permits, stony corals were harvested from the riprap substrate and relocated to the preferred coral recipient site. Coral colonies were assessed for size, overall health and growth form. Stony corals presenting signs of disease, overgrowth by an invasive boring sponge species or heavy algae, or with low potential for survival (e.g. breaking apart into very small fragments) were not removed.
Boulder relocation obstacles
Several large colonies of stony corals ranging from 2 to 3ft (0.6 to 1m) in width were unable to be successfully removed from the rock riprap due to their growth form (vertically on the riprap) and fragility. For those specimens, it was determined the entire “coral boulder” would need to be moved. This unexpected setback was overcome through coordination between the Cummins Cederberg environmental science team and the marine contractor selected for the dredging and riprap, Kearn’s Construction Company, who faced the challenge of carefully relocating massively sized boulders using heavy equipment and support divers without damaging the coral.
With each coral boulder tagged and identified by marine scientists, the Kearns Construction team carefully lifted the entire coral boulder out of the marina basin with heavy duty slings secured by commercial divers and a long-arm excavator.
“Working hand in hand to coordinate the coral boulder relocation was crucial for the success of the corals,” says Kearns Construction operations director, Brock Sullivan. “The engineer, environmental science team, and us (the contractor) had to be in sync to make sure there was no delay to the marina renovation schedule, and more importantly no harm to the coral colonies.”
The coral boulders were placed on a construction barge and transported within a short period of time to a designated area on a breakwater outside the marina basin containing existing riprap and naturally occurring corals. The time on barge for these coral boulders was minimised to reduce long-term exposure to ambient air and the potential for the living coral colonies to dessicate or be exposed to harmful direct UV radiation.
Final marina construction
Over 450 coral colonies were relocated from boulders below the fixed docks in the marina basin. Results from a six-month coral monitoring programme required by the County permit documented a success rate of over 95%, meaning almost all the relocated stony corals remained firmly attached to the seabed, were free from coral disease and were doing well in their new environment.
Notably, record high water temperatures during summer 2023 led to coral bleaching events throughout South Florida, and the relocated ‘urban’ corals appeared to fare better than neighbouring natural corals, as they were likely conditioned to unfavourable environments from living in an active marina basin.
The remarkably resilient ‘urban’ corals, which have been successfully relocated, grew on the rock riprap below the fixed docks.

The remarkably resilient ‘urban’ corals, which have been successfully relocated, grew on the rock riprap below the fixed docks.

When moving from a fixed to a floating dock system, challenges are to be expected. Through coordinated efforts with the environmental, regulatory, engineer and contractor team, we were able to resolve the basin renovations including coral relocation and permitting tasks related to the rock removal and dredging. To complement the engineering team and contractor, having an experienced team of environmental scientists and regulatory experts played a crucial role in providing Fisher Island Club with its resilient marina updates.
Vessels have started to move back into the completed sections of the new marina, offering partial marina access to residents. Construction is expected to conclude in early 2024.

READ MORE

Suntex opts for Storable technology

Second club in Brisbane

ISO wins for Liverpool

Floating dock helps meet demand for superyacht berthing

Seawall specialist appoints distributor

Diamond range launched in Amsterdam

Buying and Selling Marinas 0125

Ecotourism Australia

Coral Sea earns a first in sustainability certification

Innovation to restore seagrass meadows

Real time spill detection: automatically

Tomorrows solutions for todays problems

Navigating through choppy waters

Five star luxury at all new Porto Carlo Riva

Metstrade record breaker sets ground for bumper 2025 event

Pioneering inclusion: boatfolks accessible boating vision

Focus on future proofing

First urban marina in Huelva

Marina expansion to be hub of new harbour district

Yachting hub features in Airport City plans

Vilamoura marks 50 years with Nova Marina launch

Outstanding sweep at marina awards

LAMDA Marinas signs to build and operate megayacht marina

Survey reveals vital economic contribution

Poralu Marine launches Wearth Group

Jeddah Marina receives operator licence

Smart member comms at Hong Kong yacht club

Managing berths at expanded sites

Installing safe mooring systems

Protecting pontoon boats

Surviving Hurricane Beryl

Smart systems streamline Croatian marinas

Cimolai Technology: catering for all boat sizes

New crane design unveiled in Amsterdam

Marine Travelift E Series is ready to roll

Innovation and sustainability

Kropf delivers first all electric boat hoist

BUYING and SELLING MARINAS

Marinetek marks 30 years

Monaco Rendezvous: Smart and Sustainable Marinas 2024

Project Valencia: integrating the port with the city

Bringing new life to Banagher Marina

Is the essence of Port Grimaud under threat

Factoring in the need for electric power

Substantial progress for luxury wellness destination

Building on water The floating possibilities

Dates and times for Marinas26

Conference honours marinas and yards

Queensland marinas driving employment

Walcon to build SIBS marina for 15 years

Gold Anchor winners take centre stage

Newly merged pontoon companies eye global expansion

Iowa marina ramps up improvement plans

New management at Karpaz Gate

Code of Practice revision for now and the future

Waiheke wins green 'credits'

Dock replacement progress at Salty Sams

D Marin to manage new Med style marina

BMDC confirms construction milestone

Las Olas opens as a 'gateway to the city'

Ground breaks on first international standard marina

Pre-register for IWMC 2025

Western Marinas buys Marine and Property assets

Charlotte Harbor upgrades with new Travelift

Innovation comes in threes

Boosting the AcqueraPro network

Concrete breakwater protects municipal marina

Showcasing industry innovations

Driving growth in superyacht cruising

Transparent billing and control

Repowering inland marinas

Preparing for electric boat charging

Fast charge in Brittany

Redefining marina safety and connectivity

Continuing success in Middle East

Developing pedestals as 'technological hubs'

Broom Boats sells to Horning Pleasurecraft

Call for bids to operate Funchal Marina

Building a marina portfolio

Bring in the architects

Coastal concepts: re imagining marina potential

Port Vell shape up for America's Cup

D Marin wins tender for Camille Rayon

City green lights marina rebuild

Attenuator offers sailboat storage

Piers replaced at QEII Marina

Suntex and Northgate to manage Kimberling Resort

Biggest marina in Seoul approved

Waste clearance on the seabed

Barefoot safe decking options

New hoist completes cat haul out facility

The widest docks in Spain

How technology paves the way for a smarter marina

Avoid the pitfalls and spot the trends

Scottish marina offers development opportunities

SEA Index rolls out to French marinas

European marinas advance ocean stewardship

World first vessel to grid project

Selecting the best charge points

Marinas24: big turnout for new venue

Fourth Monaco Rendezvous focuses on innovation

IBEX 2024: Exploring the biggest issues

Creative solutions for challenging projects

Building tomorrow's floating structures

Continuing the sustainability programme

Perfecting a forklift portfolio

Collaboration sets groundwork for advanced drystack build

Sheltering boats in North Bimini

Vintage drystack is now history

Patterson Lakes: pioneering Australian automated technology

A1 plans for superyacht marina

J Pier go ahead for Sanctuary

Marina stars in latest Neom release

Four Seasons invests in Jacksonville plans

Investment boosts Ayla tourism offering

Landmark marina plans on Delaware River

Italian marinas in the broader context

MDL partners with Club Lagoon

Inland marina: first for hydrogen

Greener practices in Mallorca

Cost conscious smart marinas

Marina market insights

MDL buys prime waterfront plot

Port Dinorwic sold to local consortium

Suntex boosts northeast portfolio

New owners for Ozarks resort

The next Florida superyacht marina?

Sustainability goals across the network

Ingemar at 45 innovating for the bigger picture

Life in the seawall

Sustainable design is just 'good design'

Spoilbank Marina: a refuge from industry

The multiple factors in modern design

New waterfront to revitalise Muscat

Algarve marina now in build

Dock project completes for Marine Max

Build starts for Livorno

Oasis expands reach to Texas

Full steam ahead in Taichung

Billion dollar spend on US marinas

Reimagining Hurricane Hole as the jewel of the Bahamas

Protection from lightning strikes

Inspiration for the waterfront

Software support keeps Pacific 'jewel' on track

MDL boosts tech plan

Making marinas 'truly' smarter

Smart approach to billing

Rebuilding Snook Bight

Swedish Riviera marina rebuilds and reconfigures

Double sanitation system in Sitges

Agapi and Axopar launch AxA

Nautical Boat Club heads to Kemah

Going green with hydrogen

The base behind the race

GCCM badges new Gold Coast race

JoySail joins the racing elite

A year of growth, achievement and innovation

Trading covetable assets

Lusben development boosts refit standards

Luring megayachts to Golfito

Dock Maarten: A mecca for megayachts

IGY launches Savannah Harbor

Brisbane River marina fills 'overnight' gap

Marina access to mountain retreat

MA Marina boosts portfolio

Marina in plans for Ras Al Hekma

Marinas24 finalises programme

Oasis to manage Dania Beach

ADSP opens bids for new Cagliari port area

Thumbs up for AMI Expo

Waterfront innovations in Canada

New agent for Capria

Breaking ground on the future

Port Vell launches bunkering service

Pacsoft launches MarinaPay

Extra berths at The Boat Works

Storm protection in Quincy Bay

Dura adds smaller size mesh

Smart Marinas guide and 2022 industry statistics

Man Overboard alarm readies for export

Eco pedestals promoted for export

Safe storage for lithium batteries

Freedom adds two Sydney clubs

Rental service boost in South Florida

New transporter is fit for a Princess

Keeping it in the family

Metstrade remains essential anchor point

Adapting marinas to alternative fuel propulsion systems

EV charging in the marina industry

Whitepaper illuminates key role of bidirectional charging

Mobile fuel station pioneers sustainability and efficiency

Resilient marina renovations lead to coral relocation

New research outlines pathways to decarbonisation

A resilient rebirth at Zeke's Landing

Renovations, partnership and acquisitions

Partnership boosts nautical tourism

Replacement docks double superyacht capacity

Premier buys leading drystack

Tourist driven marina breaks ground

Waikawa extension opens

Ultra luxury on The Spit

Launching Norlana superyacht hub

Popular boat lifts form part of renovation project

New forklift boosts operator confidence

Digital payment solution for visitor moorings

Stacking up on Okanagan Lake

Smart software drives success in Mooloolaba

Using bacteria to eliminate hydrocarbon residues

Sustainable sanitation for America’s Cup bases

MDL continues multi million pound roll ut

D-Marin makes €1.7 million investment

Voting in the best for 2023

Regeneration continues at Isle of Wight harbour

Expansion plans in a buoyant market

Customers, culture, comms and carbon

Ligurian icons make a comeback

Welcoming megayachts to Istanbul

Integra buys Aventura marina

Med marina networks partner up

Renewed Dover dock nears completion

Merger creates 'biggest' South Florida marina

Sindalah yacht repair centre, first of many for Neom

New Calero group marina, and more

IBEX one of best to date

Plans firmed up for Habacoa

M3 to boost Amaala to La Belle Classe

IWMC 2025 heads to Venice

AMI keynote announced

Redeveloping a prime lakeside marina

Charging options on both sides of the Channel

Sanitary building kick starts floating building range

Hydrogen power

Floating patio becomes new marina hub

Boosting sustainability with the WRF

New lifts in facility upgrade

Interest builds for electric hoists

Majoring on the minority

Flying the Blue Flag

Silver EcoVadis for Premier

Protecting a sensitive ecosystem

Tangible benefits for the local area

Karpaz Gate Marina: A home away from home

Convenience is not a European value

Industry lobbies government on cyclone cover crisis

Upgrades at Port of Lisbon

Port 32 expands partnership with Gulfstream

North Island marina expands

Monument buys Florida marine centre

Marine Centre plans for James Watt

JYC Marina soft opens for Saudi Grand Prix

Wider decking panel– ideal for finger piers

GCMarine partners with Harbour Assist

Elevator Lift is reconfigured

Cleaning water with Advanced Oxidation

Trouble free trolley goes international

Waiting pontoon for high season

More Freedom in Australia

First in Barcelona, first in Redwood City

D Marin wins iF Design award

Futuristic pod delivered to the Pearl

New production line, new designs and noteworthy deliveries

New owners to invest in Dartside Quay

Multi use trailer for Canadian tourism service

Handle with care: a pad for all hull shapes

One year operation of electric boat hoists

Setting new delivery records for 2023

Variable width option for mobile boat hoists

IBEX 2023: focus on sustainability

In need of new marinas and new money

Superyacht marina for Dubai Islands

Swift progress on Blue Water Cay

Bermuda dock opens for superyachts

New managers for GCCM

IGY to operate NEOM's first groundbreaking marina

Mega focus in Italian marinas

Marina Bahia Golfito: the new Costa Rica destination

Rivergate up for sale

Full service in Fort Lauderdale

Go Outdoors platform launch

Upgrading key infrastructure

Marina group in administration

Operator sought for Co Down marina

How sustainable is your marina?

Geoff Phillips

UK marina group signs four year service contract

Valterri Vauramo

Joint connector enhances breakwater performance

Flovac wins second Mallorca contract

Setting a new standard in marine electrical safety

Smarter management, happier customers

Enhancing customer service across a multinational portfolio

Moss Marina: surviving the storm

Developing the Eagle Float

Wet versus dry in the western Med

First phase drystack opens in Charleston

Forklift design for growing centre console market

Pioneering drystack buys larger forklift

Industry views: Drystack storage

Promoting a customer focused culture

Ismailia contract awarded

Trophy asset for east coast portfolio

Marina completes waterfront regeneration

Investment plans for Pylos

Operator chosen for Elounda

New marina at town gateway

Guidelines for sustainable infrastructure

Evolving design over the decades

New trends drive marina reshape

Electric chargers for Italian marinas

D Marin expands digital solutions

Next generation buoy

Ultranav invests in LifeLadder

New hoist brings new technology

Pontoons for Ocean Race

Electric propulsion: a solution to pollution

Collection and protection for small islands

AMI Expo: a record breaker

Slovenian marinas join forces to boost potential

Resilience, long term vision and personal approach

Support for local businesses

Becoming a master at planning marinas

A nautical tourism centre for Piombino

Ismailia Yacht Marina: a key player in the new era of the Suez Canal

Rebuild underway at Club marina

Upgrade approved for Jones Bay

Port 32 buys Lighthouse Point

Suntex adds NJ and AZ marinas

Marina group expands to Spain

Port Vell as Cup superyacht marina

Berths still in high demand

Community space with maritime focus

Livart builds state of art factory

Dock company changes hands

New catalogue highlights

A 3D map of your marina

All change at ICOMIA

ICOMIA stats for 2021

Stellar joins Molo

Developing a fast charge network

The move to electric: e handling and e boating

Building a sustainable marina

Buzzing on full power

Innovation on the dockside

E dock supports e boat challenges

World Cup boosts pedestal contracts

Power for bigger berths in Dubrovnik

Opening the APS Seychelles agency

Building post pandemic momentum

Jesolo Marina plays major part in coastal plans

Reimagining Noss on Dart

Regeneration planning for Des Moines

Suntex buys Green Cove

New docks at Blue Haven

First NEOM island announced

Plan ahead for Marinas24

Novalja opens second phase

Melbourne City completes large berth upgrade

Inaugural PIANC America

Calypso Cove project agreed

Funding boost for Ocean Reef

MarineMax buys marina build specialist

Pod design to regenerate seagrass

First electric boat supercharger in Portugal

20 years for ICMS

Community docks for St Johns River

D-Marin invests in Sense4Boat

Autonomous gardening – anywhere under the sun

Australian marina sets new benchmark in waterfront living

Electric and traditional – hoist designs for all

Cat trailer range expanded

Ontario operator buys multi use trailer

Green o'clock at Metstrade

40 years of yard deliveries

One of the world's first electric marine hoists is installed in Spain

Twenty years of talented teamwork

Kemah Boardwalk: Gateway to Galveston Bay

Marinas and takeovers: Enough room for boating?

True spice in the Spice Island

Top US boat dealer launches first in state drystack

Captains and crew vote Coral Sea Marina 'best in world'

First superyacht repair and refit centre in UAE

Abu Dhabi: a new winter oasis

Gibraltar superyacht berths near completion

Superyachts welcome at Palm Beach marina

The big boat picture in southern Italy

Seclusion and luxury in the Bahamas

Jersey marina invests in rebuild

New superyacht haven in Greek isles

Resort opens in favoured tourist spot

Hurricane Ian devastates Fort Myers marinas

NZMOA 2022 Awards

Big Challenges, Big Decisions

Suntex expands into California market

Ocean Reef breakwaters complete

Almarin buys Aister

Historic club installs movable rowing pontoon

Partnership boosts green awareness

Fast charge expansion to US and Sweden

Customised forklift for Saxon Wharf

New decking prompts rethink

Silver and gold for D Marin

Third gen business buys third MT

MARINAS22: inspiring – and successful

Adelaide Pointe: a new development model

Repairs bring new energy to Dinner Key Marina

Buying and managing a first Italian marina

South Island gem for boating community

Construction starts at Dana Point Harbor

Second contract for 2024 Olympics

First phase completes at Windermere

Golden centrepiece at Beach Marine

Interest builds for megayacht marina

Common nautical rules sought

MarineMax to buy IGY Marinas

Bristol town upgrades harbour

Med market hit by lack of uniform fee policy

The good, the fair and the dangerous

The future of government marina leases and concessions

Boosting berths in Roskilde

Vacuum sewage system for new Spanish marina

Canadian club buys stacker crane

European boost for electric charging

Phase one portal release

Sign up surge for marina platform

Maximising occupancy: the smart way

Mia and Mateo and the smart marina

Delivering a digital future for marina management

One system for your whole business

Revolutionising time at the fuel dock

Kempinski to manage one of a kind hotel

A shared vision for the future on water

Building the first sustainable floating city

Flexible marina investment for maximum returns

New life for neglected peninsula

APCC wins Jubail contract

Resource consent for Te Rahui Herenga Waka

Spit plan contract

Berth boost at BYC

More cats welcome in Kemah

Planning for Enviro Officer course

Marina mooted in the east

Revised costing for St George's

JDC progresses mega project

Health of Industry report

MYP becomes MYTR at IBEX

Free flow club design links land to sea

Ambitious plans for a 21st century network

Azimut Benetti marinas

New all tide marina to enhance leisure mooring

Balancing land use, economics and destination appeal

When the seas rise

Sponsored feature: Semi automation boosts drystack

Phase two pier in place

Superyacht marina opts for vacuum sewerage

Storm proven attenuator protects Sunset Bay

Custom forklift for Cape Cod yard

Added value software features for ever changing industry

Developing a new green standard for Italian marinas

New yachting brand officially launched in Monaco

Coral Sea Marina Resort marks Clean Up Australia Day

Closing the loop on waste

Sustainable solutions support yard services

Composite piling for eco sense and long life

Future proofing St Michaels Marina

Trio to develop resort on Al Marjan Island

Semi automation boosts drystack profits

Final phase at Corpach

Upgrade complete at Albert Pier

Marinas to compete in Smart and Sustainable Rendezvous 2022

Abu Dhabi breaks ground on new marinas

Resort plans in Wallonia

Pelican Waters breaks ground on Queensland marina

New Cyprus Marina

Positive signs for Metstrade 2022

LA Waterfront. Setting the stage for new development

New yard in Australia

Marina group marks 35 years